The reinforcement of a monolithic floor slab is an essential component in the construction of a strong and long-lasting building. The slab’s ability to sustain varied loads and stresses over time is ensured by this process. To achieve the best results, reinforcing a floor slab requires meticulous planning, accurate calculations, and adherence to a set of specific steps.
It is crucial to comprehend the fundamentals of reinforcement before beginning the process. Steel bars, also referred to as rebar, are commonly used in reinforcement to increase the strength and flexibility of concrete. The way these steel bars are arranged—often in the form of a grid—helps distribute loads uniformly throughout the slab.
First in this process, a detailed drawing of the reinforcement layout must be created. This sketch acts as a guide to help with the rebar placement inside the slab. At this point, precise measurements and specifications are essential to guarantee that the reinforcement complies with the necessary codes and standards.
The phase of calculation follows. This entails figuring out how much and what kind of rebar is required based on the size of the slab, the loads it will support, and other elements like the surrounding environment. These computations are used by engineers to design a reinforcement strategy that optimizes the strength and longevity of the slab while reducing material consumption and expense.
Lastly, the plan comes to life with the detailed instructions for strengthening the slab. This include setting up the concrete formwork, aligning the rebar with the blueprint, and fastening it firmly. After the rebar is properly positioned, the slab is filled with concrete, which embeds the steel and fortifies the structure.
Builders can guarantee the durability, dependability, and strength of their monolithic floor slabs by adhering to these guidelines and paying close attention to details. Construction projects can only be successful if the principles and techniques of slab reinforcement are understood, regardless of whether you are a professional builder or a do-it-yourself enthusiast.
- Types of floors
- Advantages and disadvantages of solid reinforced floors
- Calculation of the slab thickness and the number of reinforcement rows
- Floor thickness
- Reinforcing mesh
- Joints of rods
- Installation of the grid
- Tie and holes for hoods and ladders
- Drawings and reinforcement schemes of a monolithic floor slab
- Design features
- Instructions for reinforcing the floor slab
- Procedure for reinforcement and pouring
- Formwork device
- Installation of reinforcement
- Video on the topic
- How to reinforce a floor #monolith #floor #reinforcement
- How to reinforce a floor slab. Reinforced concrete
- 🔴REINFORCING THE FOUNDATION🔴 Technology and materials used in reinforcing a monolithic slab. Instructions.
Types of floors
Wood or reinforced concrete floors are possible, depending on the calculations and the structure’s operating circumstances. The most widely used type is reinforced concrete, which is inexpensive, easy to create and install, and has good strength characteristics as well as resistance to different loads.
According to building type, there are:
- Standard – presented by ready-made reinforced concrete slabs of different configurations (size, shape, thickness)
- Monolithic floor, the reinforcement of which is carried out directly on site
Depending on the plates’ intended use, there are:
1. Basement – divides the lower levels from the basement’s walls
2. Floor boundaries, or interfloor
3. Attics: distinguish between living areas and spaces beneath roofs
The primary benefit of a monolithic floor slab that has been properly manufactured in compliance with all standards and guidelines and whose reinforcement has been completed in compliance with SNiP’s established requirements is weight reduction because of the cavities that are created during pouring.
Depending on the arrangement and quantity of voids, the slab may be:
- Multi-hollow – with longitudinal round cavities
- Hollow – shaped narrow panels, which are most often used as inserts
- Ribbed – complex profile with special characteristics
Large-scale construction often uses prefabricated structures; these are typically multi-story high-rise buildings and other large structures. Some drawbacks are that joints are present, special lifting equipment must be used, only standard-sized rooms can be created, and openings for hoods, figured floors, and other shapes cannot be designed.
It’s also crucial that the estimate’s total cost of work be increased considerably if monolithic floor slabs are installed. As a result, when building a floor on one’s own, reinforced mesh and concrete are typically poured right onto the construction site.
To ensure strength and durability, reinforcing a monolithic floor slab requires a careful balancing act between planning, execution, and precision. This article will walk you through all the necessary steps, from making precise calculations and intricate drawings to carrying out a methodical procedure for effective reinforcement. Whether you’re an experienced builder or a do-it-yourselfer, following these simple instructions will help you finish your construction project with a sturdy, dependable floor slab.
Advantages and disadvantages of solid reinforced floors
Metal rods, or reinforcing metal mesh, and cement mortar are the two main components of reinforced concrete floors. Impacts easily cause concrete to crumble because it is brittle and resistant to deformation despite being hard. Although metal is harder, it can withstand bending, torsion, and deformation. As a result, using these two materials in tandem yields the best outcome.
For buildings made of bricks and cellular concrete blocks, floor reinforcement is done. By choosing this option, you can complete the task without the need for specialized equipment or the assistance of professionals.
The primary benefits of monolithic floor slab reinforcement are:
- The ability to implement any non-standard project, where the support can be both load-bearing walls and decorative columns
- Construction of a floor of any size, configuration – no restrictions
- Absence of joints and seams
- Execution of all installation and other works on site
- This scheme of the slab device is used where it is not possible to involve special transport
- The structure with a rigid base is created perfectly flat, without any deflections
- High level of strength, resistance to force stress, mechanical loads, exposure to temperature, moisture
- Uniform distribution of heavy loads on the foundation
- Ease of making various communication wells, openings between floors for stairwells
- A chance to protect attics and lofts from frost with transverse and longitudinal structures
- High fire resistance
The lengthy and labor-intensive process, the requirement for at least three workers, the provision of tools and inventory, the initial need for continuous monitoring and maintenance of the monolith, and the higher cost in comparison to wooden construction are some of the drawbacks.
Calculation of the slab thickness and the number of reinforcement rows
Prior to adding reinforcement to the floor slab, all computations must be done accurately, accounting for SNiP. Partitions cannot serve as supports in the calculations; only load-bearing walls and columns placed on the foundation are taken into account. Add thirty percent to the strength calculations by multiplying the resulting indicators by a safety factor of 1.3.
Floor thickness
The thickness of the floor slab should be determined first, and it should be correlated with the wall-to-wall distance in a ratio of 1:30 (here, the thickness of the slab is equal to the span’s length). The following example is provided by the reference literature: the floor needs to be at least 200 millimeters thick if the room’s width is 6 meters, or 6000 millimeters.
The slab should be at least 120 millimeters if the space between the walls is 400 millimeters. However, experts recommend adding a certain percentage of strength in practice, keeping in mind that the rooms will contain furniture, equipment, etc. Calculations and reference examples are only applicable to attics and vacant rooms; in other situations, it is best to err on the side of caution and, in cases where the calculations indicate 120, add at least 150 millimeters.
Only the second row offers the possibility of savings, as it allows for the installation of an 8-millimeter rod and doubles the size of the slab step. It is best to leave the calculations to experts if the span is longer than six meters. In this case, special crossbars must already be installed, and deflections and other loads increase considerably, making it challenging for an inexperienced person to account for these factors.
The grip, or the portion of the slab that rests against the walls, must obviously be measured. The grip size should be 25–30 centimeters for buildings composed of foam concrete and gas silicate, and 15-20 centimeters for brick buildings. The reinforcement bars are cut to a minimum of 25 centimeters from the end so that they are filled with concrete.
It is acceptable to construct a single-tier floor if the reinforced concrete structure is 150 millimeters thick; if not, two levels are required.
Reinforcing mesh
According to SNiP, it is preferable to create two rows rather than one layer of reinforcing mesh for residential buildings. Transverse reinforcement with larger cells and a smaller cross-section can be applied to the upper row. The upper and lower rows’ reinforcement typically has an average diameter of 8 to 12 millimeters. A lattice with square cells that are 20–40 centimeters in size is created by joining the rods.
More specifically, the table shows the diameter of the rods with spans of 4 and 6 meters, accounting for typical loads of residential buildings:
The maximum distance between walls is taken into account in all calculations. Every room on the floor has the same layer of covering installed over it, with all calculations based on the largest room and values rounded to the nearest whole number.
Joints of rods
Low-carbon hot-rolled rolled steel is used to make the reinforcing frame. The metal is elastic, plastic, strong enough to support weights, resilient to vibrations, appropriate for work on unstable terrain, and unafraid of large machinery, earthquakes, etc.
The requirement for joints is considered when choosing the reinforcement for the floor slab (since the length of the rod may not be enough). Every material needs to match in terms of physical attributes and be free of rust and corrosion.
The rods are tied with wire and placed close together, spaced ten diameters apart. The double connection will be 80 millimeters if the rod is 8 millimeters thick. include a rental F12 as well; the joint measures 480 millimeters. The rods’ docking needs to be adjusted so that it is not on a single line. In order to lay longitudinal seams and form connections, welding is also utilized; however, this negatively impacts the structure’s overall flexibility.
Installation of the grid
Tightly twisting the intersections, the rods are tied with 1.5–2 millimeter diameter wire. The 8-millimeter rods that have been cut to size provide the approximately 8-centimeter spacing between the grids. At the intersections, the binding is done on the lower grid.
A space is created beneath the lower reinforcement grid to allow for the pouring of a two-centimeter-thick solution. To do this, unique conical plastic clamps are spaced one meter apart on the formwork.
Tie and holes for hoods and ladders
Formwork is installed vertically around the perimeter to join the floors to the walls and restrict the amount of concrete that can spread. The corners of the box are strengthened, and a perimeter strapping runs along them. The box is removed only when the solution has solidified completely, leaving a flat end in its place.
The formwork is positioned two centimeters away from the longitudinal rods and is removed once the frame with longitudinal and transverse reinforcement is put together. For aerated concrete, the distance from the wall is 20 centimeters; for cinder block and brick, it is 15 centimeters. To strengthen the structure against vibrations, a special compound is applied to this wall distance prior to pouring.
When it’s required to leave openings for structural components (such as ventilation, interstory stairs, communication wires, pipe conclusions, etc.), the same formwork is done. Instead of being poured, they are covered with a mesh.
Drawings and reinforcement schemes of a monolithic floor slab
An essential purpose of the slab drawings is to enable accurate calculation, planning, and execution of all tasks ahead of time. The estimation is planned, all values and indicators are identified, the consumption of materials is computed, and the choice of reinforcement for the ceiling is made based on the diagram and drawing.
Phases involved in creating a drawing:
- Taking measurements of all rooms, the outer perimeter of the house (if there is a project, transferring data from it)
- Fixing on the diagram all the holes that are not planned to be filled
- Transferring the contours of all load-bearing walls, part of the intermediate ones, making a detailed diagram of the strapping, mesh, reinforcement with the parameters of the rod thickness, tying and joining points
- Determining the size of the cells, the places of installation of the longitudinal extreme rod to the edge of the fill
- Calculating the dimensions of the profiled sheet for the lower plane of the slab
- When floor slabs are planned on the drawing, the cells are immediately distributed: usually their number does not have an integer. And the reinforcement is shifted in such a way as to obtain the same dimensions of the reduced cells near the walls
- Calculating the consumption and characteristics of materials: multiplying the length of the rod by the quantity, adding a reserve for joints (about 2%), rounding up. Calculating the required diameter for arranging the lower and upper layers
- Calculating plastic clamps and rolled products for making inserts between the meshes
- Determining the volume of cement composition – based on the area of the room and the thickness of the floor: the reinforcement for the floor slab must be covered with at least 20 millimeters of mortar from above and below to completely protect the metal from external influences and corrosion. If the total thickness of the floor is more than 15 centimeters, the reinforcement for the floor is laid in 2 layers, most of the solution is placed on top
- The drawing also specifies the number of support columns, formwork, wooden beams for the platform for pouring the floor, etc.d.
Design features
Products made of reinforced concrete combine the qualities of metal and concrete, making them perfect for use as building materials in many different contexts. While metal can readily tolerate stretching, concrete can only bear compressive loads. When building, the weight on the floors acts vertically downward and is generally evenly distributed throughout the space. Its own weight as well as the weight of all the other structures, items, and occupants in the space determine the load.
The floor slab is reinforced to withstand this load using a bending technique that can take many different forms. Typically, the rods are positioned across and along the span using two reinforcement grids (upper and lower layers). The drawing specifies the minimum step of the rods, or the space between parallel rods; for single-family residential construction, this is typically 15-20 centimeters.
The grid should be positioned 20–25 millimeters below the surface, depending on the thickness of the concrete. Knitting wire is used to secure the rods together at all intersections; occasionally, prefabricated mesh is utilized for structures. Welding is not commonly done due to the possibility of joint breaks.
To help maintain a consistent spacing between the grids, vertical clamps are positioned between the lower and upper layers of the grid. Although separators vary, they should all have the same step across the board.
Additional reinforcement in the form of G and U-shaped elements is used to reinforce the edges of the ceiling, particularly at the support points. Reinforcement is placed all the way around the perimeter if the slab is supported by the entire contour. The lower reinforcement element bears the primary load while the upper portion operates in compression. As a result, the lower layer of the mesh is arranged using thick rods, while the upper layer uses the minimum diameter of the floor slab’s reinforcement.
The size of the spans affects many of the computations; spans larger than six meters are not advised. The upper layer of the mesh is reinforced above the support itself and the lower layer of reinforcement is reinforced in the middle, if there is a greater distance between the supports.
The reinforcement rods have to be continuous, and if the diameter of the rod is 15 millimeters, the overlap should be 60 centimeters, since the overlap should be at least 40 times the diameter of the reinforcement. Hot-rolled steel reinforcement of class A3, with a diameter of 8–14 millimeters, is used to construct floor slabs.
The general guidelines are as follows: regardless of aspect ratio, it is advised to make the slab 20 centimeters thick, the reinforcement pitch 20 by 20 centimeters, the diameter of the lower layer’s rods 12 millimeters, and the upper layer’s 8 millimeters for a residential building with a span of no more than 6 meters.
Instructions for reinforcing the floor slab
Consideration of a few crucial guidelines is required in order to comprehend how to appropriately reinforce the floor slab. The primary tools needed to complete the task are class A4 steel corrugated-surface steel rods and a concrete mixture consisting of M300 cement, medium-sized crushed stone, and fine sand.
The following will be useful for the task:
- For formwork – moisture-resistant plywood or boards
- For bandaging – annealed wire and a special tool
- Equipment for bending blanks from reinforcement
- Special nippers or a grinder for cutting rods
- Everything you need to create a solution: measuring instruments, tools, containers, etc..
The work requires minimal preparation, which consists of the following steps: making calculations, creating a drawing and reinforcement plan, figuring out how much building material to buy, buying tools, cutting blanks from rods, and getting panels ready for formwork.
A brief work algorithm:
- Cutting blanks from reinforcement, tying the first layer of mesh
- Positioning the mesh with a gap of 3-4 centimeters to the surface of the formwork, fixing with vertical rods
- Tying the mesh of the second layer, installation at the site
- Pouring with concrete
Procedure for reinforcement and pouring
Formwork device
If the concrete is 20 centimeters thick, the formwork must be able to freely support the weight of the raw solution without visibly deforming, or roughly 500 kg per square meter. Plywood with a thickness of 18 to 20 millimeters is used to make panels; bars with a cross section of 10 by 10 centimeters are appropriate for racks, crossbars, and beams. Expert formwork has shown to be reliable in the workplace.
The formwork is leveled once it has been assembled.
Installation of reinforcement
It is extremely uncommon to weave the frame in a single layer; instead, two layers are typically woven (this is the norm for both ordinary and ribbed floor slabs). The bottom row of reinforcement is laid out on top of the plastic clamps (special supports that are 25–30 millimeters high and required for pouring the protective layer). Next, rods are mounted parallel to the same pitch, and the next row is placed on top of the rods at a 90-degree angle and fastened with wire.
Layer separators, which are bent and knitted in one step, are installed next. Longitudinal U-shaped elements are required for reinforcement along the edges. The top layer and the formwork should be separated by 25–30 millimeters. The prefabricated reinforcement ought to be designed as a sturdy frame that can support the weight of the workers with ease.
After that, they compact the mixture with a specialized deep vibrator and pour using a concrete pump. Pour in all at once, and then wet the surface with water for two to three days to prolong the drying process and prevent microcracks. Everything usually dries for 30 days before the formwork is taken down.
Topic | Description |
Drawing | Start by sketching the floor plan, indicating where reinforcement bars (rebar) will be placed. Ensure proper spacing and alignment for load distribution. |
Calculation | Calculate the amount of rebar needed based on the load requirements and slab dimensions. Use standard formulas to determine spacing and quantity. |
Step-by-Step Instructions | 1. Prepare the site and formwork. 2. Lay the rebar according to the drawing. 3. Secure the rebar in place. 4. Pour the concrete and let it cure. |
Building strength and stability are ensured in large part by reinforcing a monolithic floor slab. You can build a strong, long-lasting structure by closely adhering to the calculations and drawing. Steel bars are inserted into the concrete in a predetermined pattern as part of the reinforcement process to help distribute weight and withstand different forces. When done correctly, this improves the slab’s capacity to sustain weight and endure environmental strains.
Precise computations are necessary to ascertain the appropriate quantity and positioning of reinforcement. These computations consider variables such as the dimensions of the slab, the anticipated load, and the characteristics of the materials. You can make sure the slab can support the intended load without breaking or failing by following these calculations. The performance and safety of the slab are maximized and errors are reduced with this methodical approach.
You are guided through the entire reinforcement process by the detailed instructions that are provided. The instructions cover placing the steel bars in accordance with the drawing after preparing the site and erecting the formwork. Every stage is explained in detail to help you stay away from typical blunders and guarantee that the reinforcement is properly incorporated into the slab. You can create a high-quality, reinforced monolithic floor slab that satisfies all structural requirements by carefully following these instructions.