Installation (assembly) of socket boxes (sockets) in a concrete wall with your own hands – step-by-step instructions

If you’re not experienced with do-it-yourself projects, installing socket boxes in concrete walls may seem like a difficult undertaking. Nonetheless, you can effectively install your own outlets and switches, improving the usability and convenience of your area, with the correct equipment and some advice. This tutorial will take you step-by-step through the entire process, guaranteeing that you get a polished outcome without needless hassle.

Even though concrete walls are strong and long-lasting, installing electrical components in them requires special methods. Concrete is more difficult to modify than drywall, so careful planning and execution are essential. Everything you need to know will be covered in this article, from selecting the appropriate socket boxes and tools to performing the actual installation, which includes drilling into the wall and fastening the boxes.

Whether you’re upgrading your current electrical setup or adding new sockets for convenience, doing it yourself not only saves money but also makes you feel accomplished. Additionally, knowing the fundamentals of electrical installation can come in very handy for later home renovation projects. This tutorial will teach you how to install socket boxes in concrete walls safely and effectively, giving your house a tidy and dependable electrical setup.

Step Description
1. Plan Determine where you want to install the socket boxes. Ensure the area is free of wires or pipes.
2. Mark Use a template or a level to mark the positions for the boxes on the wall.
3. Drill Drill holes at the marked spots using a masonry drill bit. Make the holes slightly larger than the boxes.
4. Cut Use a chisel or a wall cutter to create openings for the socket boxes, ensuring they fit snugly.
5. Install Insert the socket boxes into the openings. Secure them with screws or adhesive as needed.
6. Wire Pull the electrical wires through the boxes and connect them to the sockets according to the wiring diagram.
7. Test Before covering up, test the sockets to ensure they are functioning properly.
8. Finish Once tested, secure the sockets in place, cover them with faceplates, and clean up the area.

Types of socket boxes

In concrete walls, plastic mounting boxes without clamping strips are used to install switches or sockets. The device’s design incorporates wiring and connecting sleeve outputs, enabling the assembly of multiple components into a block.

Holes are present on the end surface for mounting switch or socket mechanisms. Metal boxes were employed in the past, but this design was dropped because of issues with mending the mechanisms.

Certain single blocks or combined blocks made up of switches and sockets are made specifically for installing a triple socket. The design, which can be installed in load-bearing plasterboard sheet partitions and walls, is characterized by increased rigidity to bending and torsion.

Flush-mounted boxes come in two variations: a standard version with a 45 mm depth or a recessed version with a 60 mm depth, depending on the design. The second choice enables wiring inside the flush-mounted box’s cavity.

Tools and consumables

The following supplies and equipment are needed to install flush-mounted boxes in concrete surfaces:

  • an electric hammer drill equipped with an SDS Plus or SDS Max chuck;
  • a drill designed for drilling walls in concrete (diameter from 5 to 8 mm, length from 60 mm);
  • safety glasses and a mask;
  • a chisel and a hammer (it is allowed to use a special steel blade for a hammer drill);
  • a crown for drilling concrete surfaces equipped with an SDS Plus or SDS Max shank;
  • a special crown with diamond cutting edges (used for impact-free drilling of concrete surfaces);
  • a spatula for applying a gypsum mixture;
  • a container for mixing the mixture;
  • a dry solution (the weight of the substance depends on the expected volume of work);
  • a mixer for a drill used for mixing the solution.

After the wiring is laid, the socket boxes must be installed; an extra cable may be run to the installation location. Cables are installed in the rectangular channels, or grooves, that are cut into concrete walls. To create grooves, a specialized tool called a grooving cutter is utilized. It has a window that allows dust from the tool to be removed using a construction vacuum cleaner.

A diamond-tipped working tool is used in a grinder when installing cables by hand. The fine dust that this equipment emits into the space is a drawback.

Preparation of the solution

Because the concrete wall socket needs to be fixed quickly, fastening materials based on gypsum or alabaster are utilized. It takes three to five minutes for pure gypsum solution to solidify, so it’s necessary to constantly mix little amounts of the mixture and clean the container frequently to remove the solidified material.

To increase the shelf life of the solution, a mixture consisting of 3 parts of gypsum and 2 parts of Knauf Rotband gypsum plaster or similar is used. It is not recommended to use clean plaster due to the reduced mechanical strength of the hardened material.

A 3–4 liter elastic material container is used to mix the solution. Use a mixer clamped in the chuck of a drill or hammer drill (in non-stress mode) to dissolve the powder in water. Any leftover solidified solution in the container is emptied before batch mixtures are mixed.

Installation of socket boxes

A socket can be installed in a concrete wall by the owner either on their own or by getting in touch with companies that build and finish homes. You can install junction boxes, sockets, switches, and electrical cables with the assistance of specialists.

The location of the residential or office space will determine how much the work will cost. For instance, in Moscow, installing a single outlet in a cast concrete wall will run you between 600 and 700 rubles. (Without installing cables or painting the walls).

The property owner who wants to install it themselves will need to get a tool ready and follow these three steps:

  • mark the walls in the area of ​​​​the proposed installation;
  • drill mounting holes in the required quantity;
  • fix the wall boxes in the holes;
  • perform the final finishing of the wall surface;
  • mount the mechanisms and connect the power cables;
  • install the outer cover, and then test the operation of the devices.

Marking

Installation of wall boxes in a concrete wall begins with determining the location of the products. Horizontal and vertical lines are drawn on the wall surface to find the center of the box installation.

The spacing between the axes is kept between 70 and 72 mm (depending on the product manufacturer) if installing a module or multiple independent switching units is the plan. It is advised to put together the plastic boxes into a single block in order to measure the module’s dimensions, and then double-check that the markings are accurate.

Making holes

A diamond crown that is put in the chuck of a hammer drill is needed to drill a hole in a concrete wall in order to install a socket box. The mounting box type determines the hole’s depth, while the channel’s diameter ranges from 70 to 75 mm. It is permitted to drill the hole in order to save money on tools.

The center portion of the future mounting socket is removed with a chisel after the holes are drilled around its periphery. Considering the plaster layer, the hole’s depth should guarantee that the flush-mounted box fits flush with the wall surface.

Installing boxes

To install a flush-mounted box in concrete, you first need to create a template that will help you keep the mounting box block or adjacent elements in the exact location. The length of the element exceeds the module’s dimensions, and the template is made from a piece of plasterboard metal profile.

Standard screws are used to fasten the flush-mounted boxes that are assembled into a block to the guide bar. The structure is then inserted into the hole that was previously created in order to verify that the wall and socket boxes’ end surfaces are parallel.

It’s essential to prime the holes in a concrete wall to improve the adhesion of building materials and get rid of dust before repairing the socket box. The parts are fixed using materials such as gypsum mortar. Using a spatula, insert the material into the channels, and then insert the template containing the assembled module. The surplus mixture is forced out of the opening created by the channel walls and the socket box’s side walls.

The power cable is inserted into the box through a technological aperture and coiled inside. A fixing material is used to seal the cracks after the unit has been positioned horizontally.

Once the air voids have been eliminated, the solution is worked into the gaps using a spatula. A hydraulic level is then used to control the element’s position after the final filling. Spacer wedges or screws that are screwed into dowels (previously installed in the concrete surface) are used to fix the template.

Although installing socket boxes in concrete walls may appear difficult, it’s a simple do-it-yourself project if you have the right equipment and a clear guide. The straightforward, step-by-step instructions in this article will help you install socket boxes in concrete walls safely and effectively. We cover all the groundwork, from material selection to finishing touches, so you can finish the job confidently and have your electrical outlets finished in a secure and polished manner.

Installation in high-strength concrete with reinforcement

Property owners frequently ask how to install outlet boxes in a concrete wall that is strengthened with steel rods. Next, the surface is marked, the socket box’s contour is drilled with holes, and the installation center of the box is marked with an additional channel. Next, a diamond crown is fitted into the hammer drill, enabling it to drill a hole in the channel.

A crown can be used to cut the element if the steel reinforcement gets in the way of the tool. To accomplish this, turn on the impact-free mode on the hammer drill, and the soft steel reinforcement will be cut by the diamond-tipped working edges.

Using a metal drill or a grinder’s cutting disc to break the rod is acceptable. The process for installing products on regular concrete surfaces is the same as the one for installing products on further surfaces.

Common mistakes

Typical errors committed during flush-mounted box installation:

  1. Installation of wall boxes before finishing the walls, which complicates subsequent alignment of the surfaces. When installing parts with a skew, you will have to remove the mounted boxes and then seal the parts again. An additional layer of plaster reduces the likelihood of contact between the crown and the reinforcement during drilling.
  2. Installation of socket mechanisms in walls without transition elements. This installation method is strictly prohibited, since it does not provide insulation of the wall material from the power cables.
  3. Skewing of the socket block horizontally and erroneous determination of the distance between the centers of the mounting boxes. Incorrect positioning leads to the formation of gaps between the wall surface and the decorative frame of the socket module.
  4. It is prohibited to use mounting foam to fix the wall boxes, since the material does not meet fire safety requirements. There are non-combustible foams of class B1, but the strength of the material is inferior to gypsum or alabaster mixtures.

Although installing socket boxes in concrete walls may initially seem difficult, you can complete the task on your own if you have the right equipment and a well-thought-out plan. The secret is to go slowly and make sure you finish each step precisely. For a safe and functional result, every step of the installation—from marking the wall and drilling exact holes to securing the socket boxes and finishing the work—is essential.

It’s critical to keep in mind that preparation makes half the fight. Before you begin, make sure you have all the required tools and safety gear. It’s important to measure and mark your wall precisely to prevent costly or time-consuming mistakes down the road. Your best friends when it comes to drilling are accuracy and patience. To guarantee a snug and secure fit for the socket boxes, always check the depth and alignment of the holes.

It will be worthwhile to take the time to carefully align and secure the socket boxes after they are installed. This step guarantees that your sockets are safe to use in addition to being operational. Lastly, make sure everything is functioning properly by testing your new outlets and tidying up the installation area. Ensuring safety and satisfaction both depend on this final inspection.

You can add value and functionality to your space by installing socket boxes in concrete walls with confidence by following these steps. This guide offers a simple way to get results that look professional, regardless of whether you’re a do-it-yourself enthusiast or just trying to save money on professional installation costs.

Video on the topic

Installation of wall boxes. Video without Water! How to install a wall box

Installation of wall boxes (without a diamond core drill) in a concrete wall and installation of a wall box with your own hands

Installation of wall boxes before plastering

✅Installation of a wall box on PLASTER!

HOW NOT TO INSTALL SOCKETS WITH YOUR OWN HANDS? #038

Which aspect of concrete application are you most interested in?
Share to friends
Dmitry Sokolov

Chief engineer in a large construction company. I have extensive experience in managing construction projects and implementing modern technologies.

Rate author
StroyComfort1.com
Add a comment