How to build a garage from aerated concrete with your own hands – technology, step-by-step plan

A satisfying project that can save you money and give you a great sense of accomplishment is building a garage yourself. Aerated concrete is among the best materials for this type of do-it-yourself building. Because of its great insulation qualities, portability, and ease of use, it is ideal for garages.

We’ll walk you through the process of building an aerated concrete block garage in this article. We’ll go over everything, from the preliminary planning phases to the finishing touches, to make sure you have all the knowledge required to get going and finish the project effectively.

Whether you’re a novice seeking a new project or an expert builder with years of experience, our detailed plan will guide you through every phase of the building process. We can help with all aspects of the project, from laying the foundation and building the walls to installing the roof and adding the finishing touches.

Gather your supplies and let’s begin constructing a strong, functional garage that will shield your car and offer more storage space. You will have a firm grasp of the construction procedure and the self-assurance to take on this project by yourself by the time you finish reading this guide.

DIY garage made of aerated concrete – advantages of the material

The best material to use if you’ve decided to begin building a garage out of aerated concrete is aerated concrete.

It has numerous advantageous qualities.

Apart from the aforementioned benefits, it is worth mentioning that the material can be effortlessly processed and modified using a grinder and a hammer drill, in place of specialized cutting and grinding instruments. The fact that aerated concrete is extremely hygroscopic and absorbs moisture practically like a sponge is the only bad thing about this barrel of honey. Nevertheless, plastering the walls or adding siding to the facades will level this disadvantage.

Doing your own DIY aerated concrete garage construction is a useful and satisfying project that blends affordability and longevity. This manual will lead you through the procedure, offering a precise, detailed plan to assist you from foundation installation to roof completion. You’ll discover the equipment, supplies, and methods required to make sure your garage is durable, strong, and built to last. Even a do-it-yourself enthusiast can accomplish this project and feel the satisfaction of building a long-lasting and functional structure with the correct planning and attention to detail.

Preparatory events

A number of prerequisite actions must be completed prior to construction in order for any construction to proceed:

  1. Develop a project with relevant documentation or choose ready -made in accordance with the soil and relief.
  2. Make calculations to determine the required amount of building material.
  3. Prepare or purchase building tools.

Once everything is finished, you can move straight on to the building. Since being well-prepared is essential for success, we will go over each topic in greater detail.

Design

When you decide to purchase your own garage, this is the first thing you should do. If you possess the necessary knowledge, you can create a project from scratch or utilize the resources of the worldwide network to download a pre-made one or create your own using simplified engineering programs.

Should the project prove to be excessively intricate, your best bet would be to get in touch with a licensed architect who can assist you in realizing your vision while adhering to established guidelines and technological constraints. Since typical garage projects are often created with a number of tolerances that are not always taken into account during construction, calling in professionals is still the best course of action.

Material calculation

As an example of calculation, we can give a typical project of a garage made of aerated concrete with an area of ​​4 by 6 meters and a wall height of 2.4 meters. Standard block size 0.2×0.3×0.6 m. The formula used in the calculation is (L x H – Sp) x 1.05 x B = V, where L is the length of all walls, H is the height, Sp is the area of ​​all openings, windows, gates and doors, coefficient 1.05 is the adjustment for fitting and joints of blocks during construction (on average 5%), B is the thickness of the block, and V is the entire volume of aerated concrete blocks. You can also calculate blocks based on the area of ​​the walls of the room.

Since the battle and marriage of the material must also be taken into account, it is necessary to round the values to the whole values in plus when performing calculations. Although 150 mm is the ideal wall thickness, it is worthwhile to build walls that are at least 40 cm (or 30, but with more insulation) thick in colder climates.

Preparation of materials and tools

Following all the computations, a tool inventory must be done. If any are missing, the material must be purchased. For the task at hand, you will require:

  • Khosuovka for aerated concrete.
  • Strobores.
  • A set of brushes.
  • Carriage for distribution of glue by block.
  • Spatula with a gear edge.
  • Kelma Bucket for aerated concrete.
  • Plumb.
  • Level.
  • Rubber kiyanka.
  • Shovels.
  • Adhesive solution.

You will require the following supplies in addition to the blocks themselves:

  • Crushed stone.
  • Cement solution .
  • Sand.
  • Boards for the construction of formwork.
  • Reinforcement (for strapping).
  • Adhesive for laying blocks.

Important: The construction phase can be the most influential, even with meticulous planning. Winter or late autumn are not the best times to begin construction.

Since the blocks are roughly the same quality everywhere, choosing them is not difficult. Avoid overspending by concentrating on the average cost. The best months to start construction are May and June. The earth has sufficiently warmed and dried out at this point to guarantee both high-quality construction and comfortable working conditions. Construction will take two to three months on average.

Step Description
1. Planning and Permits Check local regulations and get necessary permits. Plan the size, location, and design of your garage.
2. Foundation Excavate the area, set up forms, and pour a reinforced concrete foundation.
3. Wall Construction Lay the first course of aerated concrete blocks, ensuring they are level. Continue building the walls, staggering the joints.
4. Windows and Doors Install frames for windows and doors as you build the walls, ensuring they are properly aligned and secure.
5. Roof Construct the roof framework, cover it with sheathing, and add roofing material.
6. Finishing Apply exterior and interior finishes, such as plastering the walls and painting. Install the garage door and any other fittings.

Aerated concrete garage construction is a doable project for many do-it-yourselfers. This material is a great option for such a structure because of its lightweight and insulating qualities. A well-defined, methodical plan will help you make sure your garage is reliable and effective.

You’ll give the aerated concrete blocks the support they need by starting with a sturdy foundation. Since the first row establishes the foundation for the entire construction, accuracy in its laying is essential. Maintaining alignment and appropriate adhesion with each subsequent layer will strengthen the garage as a whole.

Both the roof and the final details matter. Your garage will be shielded from the weather by a well-insulated and waterproofed roof, regardless of the type of roof you choose. Functionality and security will be improved by paying attention to little things like window and door installation.

Aerated concrete block garage construction calls for careful planning and execution, but the end product is a sturdy, well-insulated area. You can design a garage that suits your needs and increases the value of your home with a little perseverance and the appropriate equipment.

Video on the topic

GARAGE FROM AERATE CONCRETE, the first row of aerated concrete blocks, I do it myself, the garage of my dreams.

DIY aerated concrete garage for 150,000, FULL VIDEO

Building a garage for 2 cars | Walls made of aerated concrete on glue-foam!

Which aspect of concrete application are you most interested in?
Share to friends
Dmitry Sokolov

Chief engineer in a large construction company. I have extensive experience in managing construction projects and implementing modern technologies.

Rate author
StroyComfort1.com
Add a comment