Because concrete rings are strong, long-lasting, and simple to install, they are a common material choice for well construction. They offer a strong and dependable framework that guarantees the well’s durability and secure operation. Concrete ring wells are a long-lasting and workable solution for various uses, including irrigation and drinking water.
Although the process of building a well with concrete rings is simple, it needs to be carefully planned and carried out. To guarantee a successful and secure well, precise measurements, secure ring placement, and appropriate site selection are crucial steps. Many homeowners can even complete this project themselves with the correct equipment and know-how, saving money on labor and feeling proud of themselves in the process.
The essential procedures for building a well out of concrete rings are outlined in this article. Everything will be covered, including selecting the ideal location, getting the site ready, installing the rings, and finishing the well. You can build a dependable well that fulfills your requirements and improves your property by following these steps.
Step | Description |
1. Planning | Determine the location and depth of the well. |
2. Excavation | Dig a hole slightly larger than the concrete rings. |
3. Preparing the base | Level the bottom and add a layer of gravel for drainage. |
4. Lowering rings | Carefully lower the concrete rings into the hole, one at a time. |
5. Sealing joints | Seal the joints between the rings to prevent water leakage. |
6. Backfilling | Fill the space around the rings with soil, tamping it down firmly. |
7. Installing the cover | Place a concrete cover on top to secure the well. |
- What is needed for the device?
- Installation of all concrete rings at once
- Alternate installation
- Calculating the rings
- Selection of materials
- Installation work
- Video on the topic
- Concrete rings for a well. Experience of use.
- Well for water, sewerage. Polymer-sand well. Installation, characteristics, price.
- Septic tank made of concrete rings. Sewage in a house made of concrete rings
- Installation of a polymer-composite well
- DIY well. Part 3 – Installation of concrete rings.
- How to dig a well? Important points.
What is needed for the device?
Selecting the ideal location for a concrete well is crucial before any construction work is undertaken. Research will be required to ascertain whether or not there is water below ground and to what depth it is located in order to make this decision. You will then need to determine its quantity and quality.
The future well site should be at least 35 meters away from any sources of manure or other organic waste. Wells shouldn’t be constructed in ravines, on hillsides, or next to rivers. This puts groundwater infiltration at risk. Once the location has been determined, you must obtain authorization from the relevant authorities.
Such devices are carried out in two ways. The first method is to build from monolithic concrete, and the second – from precast. Building concrete is a reinforced concrete ring that is produced in industrial workshops. Factories in our country produce rings of different types and sizes. In the production of monolithic wells, the process occurs directly at the installation site. A similar method of erecting a device is much slower, more time -consuming. If you perform the device from the prefabricated rings, then the process will be more economical, convenient and fast. Such a well does not threaten the destruction of walls or entering various pollutants inside. To find out the required number of rings, it is worth starting from the level of the depth of the aquifer.
It’s also important to provide a list of the equipment and supplies needed:
- rings of the required size;
- various types of filtrates;
- substances for waterproofing the walls of the well;
- sealant for seams and cracks;
- shovels;
- buckets;
- winch;
- overalls;
- level;
- trowel;
- wooden boards;
- roulette.
Installation of all concrete rings at once
When installing a concrete structure using this method, the concrete rings are installed all at once and the excavation is done by hand. Using such a concrete tool, digging holes is typically done by hand. Since it has to do with the accuracy with which the concrete rings will be mounted, this process is not automated.
The original way of creating a pit for these kinds of wells. The pit is excavated to the maximum depth specified by the device, accounting for the necessary length. The pit’s diameter ought to be roughly thirty centimeters bigger than the concrete ring’s. This is required to ensure that nothing gets in the way of the concrete rings when they are being lowered into the pit. additionally for the device’s additional waterproofing.
It will be much more beneficial to work on excavating a pit during the summer. This is required to prevent rainwater from combining with the aquifer in the wells. It is important to be aware that aquiferous sand can be found between 6 and 11 meters down.
It makes sense to stop digging when the pit’s depth reaches the water. Next, the well’s water and sand must be pumped out. The pit is already deeper than a person’s height, so you’ll need to install a structure with a winch. This will simplify the procedure. A winch is used to raise a bucket to the surface after someone fills it while submerged in the water at the bottom of the pit.
One by one, a concrete ring surrounds the pit’s bottom. You can also employ a winch mechanism in this situation. Special fasteners are first affixed to the first concrete structure before it is eventually lowered. In the future, it will prevent the wells from moving. In order to improve contact, a unique mixture is applied to the ring gaps.
Then, one concrete component is lowered at a time. Remember, though, that the final ring—which concludes with a well—should be situated 25 centimeters above the ground.
Alternate installation
The second installation method permits a pit to be gradually dug. First, a pit that is as tall as one building is excavated. It is lowered into the pit, this concrete structure. Following that, the pit is excavated in a ring until it reaches a new height. They start carefully excavating the ground beneath the device when the pit reaches the necessary depth. As a result, it gradually descends. The next ring is then submerged and falls into the pit as a result of its own weight. Excavation of a pit is done until water is visible at the bottom.
Making a water filter is crucial when excavating a well for the future. Crushed stone, gravel, and stones are used in this type of filtration. The filter’s height shouldn’t be any smaller than 30 centimeters. It is worthwhile to install a unique geological lining between all the layers since it improves water filtration significantly. On the other hand, the filtration layer can be lowered if the water started to flow more slowly following these adjustments.
A mixture of sand and gravel needs to be poured into the empty space between the well and the ground. Adding some clay to this area would be a good way to improve the structure’s waterproofing.
Constructing concrete ring wells is a useful and long-lasting method of gaining access to groundwater, frequently employed in residential and agricultural contexts. Using this technique, precast concrete rings are stacked to create a strong, waterproof structure that guarantees dependability and safety over the long run. Concrete ring wells are an effective way to supply clean, reliable water when installed correctly, which is why many farmers and homeowners choose them.
Calculating the rings
To determine which option is best and how many is needed, you should do the following:
- Find out the depth of your neighbor"s well. If there are no neighbors nearby, you should go to the responsible authority, which will be able to provide advice on the level of the aquifer. This data is needed to calculate the exact number of rings for the well.
- The volume of the concrete product must be chosen wisely, because the larger the diameter, the lower the water level will be. It follows that too voluminous products are not suitable.
- Another characteristic that needs to be taken into account is the thickness of the walls.
One meter can be thought of as the ideal diameter for a concrete product. The most common application for these is in well construction. A diameter that is too large will lower the water level; a diameter that is too small will cause inconveniences during construction and future use. The product should be held at a height of about 90 centimeters. The well that has this indicator is the most stable and long-lasting.
Selection of materials
It is worthwhile to take care of the well’s walls once the hole has been dug. Typically, one of the following materials is utilized: brick, concrete rings, stone, or natural wood. Wood deteriorates quickly and is not a very durable material. We must not overlook the fact that it may also have an impact on the well’s water’s flavor.
It is acknowledged that concrete rings are the most beneficial material. To prevent the walls from collapsing while the machine is operating, they must be strengthened. The parts of the head that are above the earth’s surface are constructed from the materials of their choice.
Installation work
The lowering method is used to create a deeper well if one is required. Special brackets can be used to fix the products to each other so that the structure doesn’t shift. This is the method for waterproofing cracks: after applying a primer, a tourniquet is inserted and the crack is sealed with cement mortar. If you incorporate a plasticizer into the cement mixture, the waterproofing will be enhanced.
Repairs are made using a sealant or specialized cement mortar if the rings have moved. This procedure is carried out both within and outside the well. When wall cracks show up, the same action is taken. If the damage is minor, you can work on just one side.
In the event that a pipeline is intended, specific holes in the rings must be made. With a chaser, they are created. The holes’ diameter ought to be marginally greater than the pipe’s diameter. In order to perform sealing work, this is required. After these projects are finished, everything is filled in and floor slabs are installed. It is advised that the well be drained if the groundwater is near the earth’s surface. Clay, which is positioned between the pit’s wall and the rings’ walls, helps achieve this.
The building of the head will be the final stage of the well’s construction. Using a concrete ring will be the simplest solution. You can execute a range of external finishes on its foundation. Building a roof is essential because it will shield the well from debris, rain, and dirt.
Constructing wells using concrete rings is a workable and long-lasting fix. It can tolerate a range of environmental conditions and guarantees a steady supply of water. Even though the process is labor-intensive, it is beneficial in the long run.
Using the proper tools and adhering to safety procedures are essential throughout the construction process. Ensuring the well’s longevity and preventing contamination can be achieved by properly aligning and sealing the rings. The well will remain in good operating order with routine maintenance, such as cleaning and crack inspection.
The work required to build the well will pay off whether you use it for irrigation, drinking water, or other uses. A sturdy, dependable structure that will last you many years is offered by concrete rings. You can benefit from a dependable water source that satisfies your needs by giving the construction some thought and attention.